E-N RAMP over 4TH AVE BUILDINGS
0.2 W JCT I-90 · County 033, Washington · Built 2003 · 1 Lanes · 606 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.590453, -122.329
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 23 years old.
Nearby Bridges
I-90 EB over BUS DEPOT PED PATH BLDNS
Built 2003
SR 519 over STADIUM BNSFRR 4TH AVE
Built 2002
E-S RAMP over BUILDING PARKING LOT
Built 2003
S-E RAMP over 4TH AVENUE
Built 2003
N-E RAMP over 4TH AVE S
Built 2003
I-90 W-N RAMP over 4TH AVE AND SOUND TRANS
Built 2010
ROYAL BROUGHAM WAY over RAILROAD
Built 2010
I-90 over CITY STREETS
Built 1991
I-90 E-S RAMP over I-5/AIRPORT WAY RAMP
Built 1965
COLORADO AVE over SR 99
Built 2013
Bridge Details
- Structure #
- 0015983D0000000
- Year Built
- 2003
- Length
- 65.8 m (215.9 ft)
- Max Span
- 24.7 m
- Width
- 6.4 m (21 ft)
- Lanes
- 1
- Daily Traffic
- 606
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,052,000
- Total Project Cost
- $4,104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.