I-90 W-N RAMP over 4TH AVE AND SOUND TRANS
0.4 W JCT I-5 · County 033, Washington · Built 2010 · 2 Lanes · 11,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.592111, -122.327528
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 16 years old.
Nearby Bridges
S-E RAMP over 4TH AVENUE
Built 2003
E-N RAMP over 4TH AVE BUILDINGS
Built 2003
I-90 EB over BUS DEPOT PED PATH BLDNS
Built 2003
SR 519 over STADIUM BNSFRR 4TH AVE
Built 2002
I-90 over CITY STREETS
Built 1991
E-S RAMP over BUILDING PARKING LOT
Built 2003
ROYAL BROUGHAM WAY over RAILROAD
Built 2010
N-E RAMP over 4TH AVE S
Built 2003
I-90 E-S RAMP over I-5/AIRPORT WAY RAMP
Built 1965
SEATTLE BLVD over SOUND TRANSIT TUNNEL
Built 1910
Bridge Details
- Structure #
- 0017597A0000000
- Year Built
- 2010
- Length
- 352 m (1154.9 ft)
- Max Span
- 84.1 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 11,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,035,000
- Total Project Cost
- $12,070,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.