ALASKAN WAY SOUTH over BNSF RR
3.6 N JCT SR 509 · County 033, Washington · Built 2013 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.591758, -122.337022
This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 13 years old.
Nearby Bridges
COLORADO AVE over SR 99
Built 2013
SR 99 over SR 519 (ATLANTIC ST)/RR
Built 2011
SR 99 OFF RAMP over RAMP AND TERRAIN
Built 2019
SR 99 over CITY STREETS & RAILROAD
Built 2011
SR 99 over TERRAIN
Built 2011
ROYAL BROUGHAM WAY over RAILROAD
Built 2010
S-E RAMP over 4TH AVENUE
Built 2003
SR 519 over STADIUM BNSFRR 4TH AVE
Built 2002
E-S RAMP over BUILDING PARKING LOT
Built 2003
E-N RAMP over 4TH AVE BUILDINGS
Built 2003
Bridge Details
- Structure #
- 0018290B0000000
- Year Built
- 2013
- Length
- 266.7 m (875 ft)
- Max Span
- 35.4 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,819,000
- Total Project Cost
- $11,638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.