TALBOTT RD over DRY CREEK
0.223N LW DRY CREEK · County 071, Washington · Built 1997 · 2 Lanes · 17 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.067325, -118.549406
This bridge is in worse condition than 7.2% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 29 years old.
Nearby Bridges
BUCKLEY RD over DRY CREEK
Built 1992
MCDONALD RD over WALLA WALLA RIVER
Built 1989
LOWER DRY CREEK RD over US 12
Built 2023
US 12 over FRENCHTOWN ACCESS RD
Built 2023
US 12 over FRENCHTOWN ACCESS RD
Built 2023
US 12 over DRY CREEK
Built 2023
US 12 over DRY CREEK
Built 2023
OLD HWY 12 over DRY CREEK
Built 1961
LOWDEN GARDENA RD over WALLA WALLA RIVER
Built 2010
WOODWARD CANYON RD over US 12
Built 2023
Bridge Details
- Structure #
- 086302000000000
- Year Built
- 1997
- Length
- 43.8 m (143.7 ft)
- Max Span
- 42.4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 17
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,774,000
- Total Project Cost
- $5,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.