US 12 over FRENCHTOWN ACCESS RD

19.3 E JCT US 730 SPUR · County 071, Washington · Built 2023 · 2 Lanes · 4,072 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019406K0000000
Year Built
2023
Length
17.4 m (57.1 ft)
Max Span
14.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,072
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$542,000
Total Project Cost
$1,083,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.