US 12 over DRY CREEK

16.1 E JCT US 730 SPUR · County 071, Washington · Built 2023 · 2 Lanes · 3,740 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019406H0000000
Year Built
2023
Length
35.8 m (117.5 ft)
Max Span
31.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
3,740
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,116,000
Total Project Cost
$2,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.