WOODWARD CANYON RD over US 12

15.2 E JCT US 730 SPUR · County 071, Washington · Built 2023 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019406F0000000
Year Built
2023
Length
44.7 m (146.7 ft)
Max Span
43.1 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,183,000
Total Project Cost
$2,366,000