IRR VALLEY AV E over WAPATO CREEK

2.2 E JCT SR 5 · County 053, Washington · Built 1994 · 4 Lanes · 18,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
086192000000000
Year Built
1994
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
18,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,612,000
Total Project Cost
$3,224,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.