SR 167 NB over PUYALLUP RIVER

6.4 N JCT I-5 · County 053, Washington · Built 2015 · 2 Lanes · 17,815 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0018513A0000000
Year Built
2015
Length
170.1 m (558.1 ft)
Max Span
88.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
17,815
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,241,000
Total Project Cost
$8,482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.