SR 167 over PUYALLUP RIVER

6.4 N JCT I-5 · County 053, Washington · Built 1971 · 2 Lanes · 17,815 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008903A0000000
Year Built
1971
Length
164.9 m (541 ft)
Max Span
39.6 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
17,815
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,854,000
Total Project Cost
$7,709,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.