SR 167 over CLARKS CREEK

3.7 N JCT I-5 · County 053, Washington · Built 1970 · 5 Lanes · 25,053 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008682A0000000
Year Built
1970
Reconstructed
1978
Length
39.9 m (130.9 ft)
Max Span
15.5 m
Width
22.7 m (74.5 ft)
Lanes
5
Daily Traffic
25,053
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,427,000
Total Project Cost
$4,854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.