Airport Way S over ARGO RR Yard

5200 Airport Way S · County 033, Washington · Built 1928 · 4 Lanes · 17,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

47.555931, -122.322378

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 98 years old.

Nearby Bridges

Bridge Details

Structure #
085358000000000
Year Built
1928
Reconstructed
2012
Length
291.4 m (956 ft)
Max Span
32.6 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
17,500
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$8,413,000
Total Project Cost
$16,826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.