I-5 over LUCILE ST

3.9 N JCT SR 900 · County 033, Washington · Built 1966 · 5 Lanes · 96,847 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

47.553475, -122.317767

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
0007734C0000000
Year Built
1966
Reconstructed
1995
Length
57.9 m (190 ft)
Max Span
21.3 m
Width
24.1 m (79.1 ft)
Lanes
5
Daily Traffic
96,847
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,978,000
Total Project Cost
$5,956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.