S-W RAMP over LUCILE ST & RR
4.1 N JCT SR 900 · County 033, Washington · Built 1967 · 2 Lanes · 12,879 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.553458, -122.318667
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
S LUCILE ST over RR TRACKS
Built 1981
I-5 over LUCILE ST
Built 1966
I-5 over LUCILE ST
Built 1966
N-W RAMP over RAILROAD
Built 1967
I-5 over N-W RAMP
Built 1966
I-5 S-W N-W RAMPS over AIRPORT WAY
Built 1967
Airport Way S over ARGO RR Yard
Built 1928
E-N RAMP over I-5
Built 1966
RAMP TO I-5 NB/SB over CITY STS RAMP & RR
Built 1966
S-ALBRO RAMP over TERRAIN
Built 1966
Bridge Details
- Structure #
- 0007930C0000000
- Year Built
- 1967
- Length
- 167.6 m (549.9 ft)
- Max Span
- 30.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 12,879
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,572,000
- Total Project Cost
- $9,144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.