I-5 over LUCILE ST
3.9 N JCT SR 900 · County 033, Washington · Built 1966 · 6 Lanes · 96,847 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.553469, -122.318272
This bridge is in worse condition than 96.1% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
S-W RAMP over LUCILE ST & RR
Built 1967
I-5 over LUCILE ST
Built 1966
S LUCILE ST over RR TRACKS
Built 1981
I-5 over N-W RAMP
Built 1966
N-W RAMP over RAILROAD
Built 1967
I-5 S-W N-W RAMPS over AIRPORT WAY
Built 1967
Airport Way S over ARGO RR Yard
Built 1928
E-N RAMP over I-5
Built 1966
RAMP TO I-5 NB/SB over CITY STS RAMP & RR
Built 1966
S-ALBRO RAMP over TERRAIN
Built 1966
Bridge Details
- Structure #
- 0007734B0000000
- Year Built
- 1966
- Length
- 52.4 m (171.9 ft)
- Max Span
- 21.3 m
- Width
- 28.5 m (93.5 ft)
- Lanes
- 6
- Daily Traffic
- 96,847
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,758,000
- Total Project Cost
- $7,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.