FREYA WAY over SIRR (UPRR)

00.13 N SR290 · County 063, Washington · Built 1971 · 4 Lanes · 28,557 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 6 Satisfactory

Location

47.669825, -117.362089

This bridge is in worse condition than 51.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 55 years old.

Nearby Bridges

Bridge Details

Structure #
085241000000000
Year Built
1971
Reconstructed
2004
Length
238.8 m (783.5 ft)
Max Span
43.6 m
Width
20.8 m (68.2 ft)
Lanes
4
Daily Traffic
28,557
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$23,368,000
Total Project Cost
$46,737,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.