SR 290 over SPOKANE RIVER

0.8 E JCT I-90 · County 063, Washington · Built 2023 · 2 Lanes · 7,326 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019509A0000000
Year Built
2023
Length
159.3 m (522.6 ft)
Max Span
38 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
7,326
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,592,000
Total Project Cost
$9,183,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.