I-90 RAMP over E 2ND AVE

0.8 E JCT US 2 · County 063, Washington · Built 1974 · 1 Lanes · 7,964 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009622D0000000
Year Built
1974
Length
83.8 m (274.9 ft)
Max Span
32 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
7,964
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,024,000
Total Project Cost
$4,049,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.