FREYA ST over I-90

2.4 E JCT US 2 · County 063, Washington · Built 1957 · 4 Lanes · 20,325 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

47.653847, -117.357667

This bridge is in worse condition than 51.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
0005453D0000000
Year Built
1957
Length
34 m (111.5 ft)
Max Span
16 m
Width
18.7 m (61.4 ft)
Lanes
4
Daily Traffic
20,325
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$982,000
Total Project Cost
$1,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.