MISSION AVENUE over SPOKANE RIVER
1.13 E OF SR395 · County 063, Washington · Built 1909 · 4 Lanes · 19,319 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.671767, -117.387153
This bridge is in worse condition than 81.9% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 117 years old.
Nearby Bridges
SR 290 over SPOKANE RIVER
Built 2023
SPOKANE FALLS BLVD over SPOKANE RIVER
Built 2003
SR 290 over RR SPOKANE RIVER CITY ST
Built 1984
SPRAGUE WAY S/B over ERIE STREET
Built 1953
SR 290 W-W RAMP over 3RD AVE & W-E RAMP
Built 1971
SPRAGUE AVENUE over ERIE STREET
Built 1954
SPRAGUE AVENUE over SPRAGUE WAY SB
Built 1954
GREENE STREET over SPOKANE RIVER LOCAL RDS
Built 1955
FREYA WAY over SIRR (UPRR)
Built 1971
SR 290 W-W RAMP over 2ND AVE
Built 1974
Bridge Details
- Structure #
- 085123000000000
- Year Built
- 1909
- Length
- 118.9 m (390.1 ft)
- Max Span
- 23.2 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 4
- Daily Traffic
- 19,319
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,780,000
- Total Project Cost
- $23,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.