SR 285 over S WENATCHEE AVE

0.2 N DOUGLAS CO · County 007, Washington · Built 1973 · 6 Lanes · 48,107 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
085169000000000
Year Built
1973
Reconstructed
2013
Length
39.6 m (129.9 ft)
Max Span
38.7 m
Width
25.1 m (82.3 ft)
Lanes
6
Daily Traffic
48,107
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,532,000
Total Project Cost
$5,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.