SR 285 over S WENATCHEE AVE
0.2 N DOUGLAS CO · County 007, Washington · Built 1973 · 6 Lanes · 48,107 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.409389, -120.300203
This bridge is in worse condition than 91.9% of bridges in County 007. The average bridge in Washington is 0 years old; this one is 53 years old.
Nearby Bridges
SR 285 over COLUMBIA R GN RY
Built 1950
SR 28 over SR 285 S-W RAMP
Built 1950
MALAGA ALCOA HWY over SQUILCHUCK CREEK
Built 1954
FOURTH ST NE over G.W.R.D. IRRIGATION CANA
Built 1945
MILLERDALE AVE over WEN REC IRRIG CANAL
Built 1975
Second Street over Highline Canal
Built 2020
MALAGA-ALCOA HWY over STEMILT CR.
Built 1951
Eastmont Avenue over Canyon B Drainage
Built 2012
OLD WEST MALAGA RD over STEMILT CREEK
Built 1936
SR 285 over WENATCHEE RIVER & BNSF
Built 1933
Bridge Details
- Structure #
- 085169000000000
- Year Built
- 1973
- Reconstructed
- 2013
- Length
- 39.6 m (129.9 ft)
- Max Span
- 38.7 m
- Width
- 25.1 m (82.3 ft)
- Lanes
- 6
- Daily Traffic
- 48,107
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,532,000
- Total Project Cost
- $5,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.