Second Street over Highline Canal

W of Canal Blvd S of 5th · County 007, Washington · Built 2020 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
089260000000000
Year Built
2020
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$198,000
Total Project Cost
$395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.