SR 285 over COLUMBIA R GN RY

0.2 N JCT SR 28 · County 017, Washington · Built 1950 · 5 Lanes · 26,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0003477A0000000
Year Built
1950
Length
368.2 m (1208 ft)
Max Span
146.3 m
Width
19.7 m (64.6 ft)
Lanes
5
Daily Traffic
26,350
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,936,000
Total Project Cost
$37,871,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.