Eastmont Avenue over Canyon B Drainage

CANYON B · County 017, Washington · Built 2012 · 3 Lanes · 8,295 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

47.457639, -120.291306

This bridge is in worse condition than 10% of bridges in County 017. The average bridge in Washington is 0 years old; this one is 14 years old.

Nearby Bridges

Bridge Details

Structure #
088534000000000
Year Built
2012
Length
182 m (597.1 ft)
Max Span
72.8 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
8,295
Material
Concrete Continuous
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$7,373,000
Total Project Cost
$14,746,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.