US 2 over DRY WASH

0.7 E JCT US 97 ALT · County 017, Washington · Built 1974 · 4 Lanes · 12,899 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009683B0000000
Year Built
1974
Length
87.8 m (288.1 ft)
Max Span
39.6 m
Width
30.8 m (101 ft)
Lanes
4
Daily Traffic
12,899
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,062,000
Total Project Cost
$10,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.