SR 509 over HYLEBOS CREEK
4.1 N JCT I-705 · County 053, Washington · Built 1967 · 4 Lanes · 22,574 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.258978, -122.357311
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
12TH ST E over WAPATO CREEK
Built 2023
SR 509 over WAPATO CREEK
Built 1995
12TH ST E over HYLEBOS CREEK
Built 2023
I-5 over HYLEBOS CREEK
Built 1960
SR 99 (54TH AVE E) over I-5 RAMPS
Built 1961
I-5 over HYLEBOS CREEK
Built 1960
PORTER WAY over I-5 HYLEBOS CR
Built 1960
I-5 over HYLEBOS CREEK
Built 1960
SR 99 over HYLEBOS CREEK
Built 1927
I-5 over HYLEBOS CREEK
Built 1960
Bridge Details
- Structure #
- 084942000000000
- Year Built
- 1967
- Reconstructed
- 1994
- Length
- 29.6 m (97.1 ft)
- Max Span
- 10.4 m
- Width
- 19.9 m (65.3 ft)
- Lanes
- 4
- Daily Traffic
- 22,574
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,152,000
- Total Project Cost
- $2,304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.