12TH ST E over HYLEBOS CREEK

0.34 W HWY 99 · County 053, Washington · Built 2023 · 2 Lanes · 4,225 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.246278, -122.343139

This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
0019540R0000000
Year Built
2023
Length
21.3 m (69.9 ft)
Max Span
20.9 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,225
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$632,000
Total Project Cost
$1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.