I-5 over HYLEBOS CREEK

1.3 N JCT SR 99 · County 053, Washington · Built 1960 · 5 Lanes · 96,536 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0006361C0000000
Year Built
1960
Reconstructed
2010
Length
23.8 m (78.1 ft)
Max Span
20.1 m
Width
26.1 m (85.6 ft)
Lanes
5
Daily Traffic
96,536
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,373,000
Total Project Cost
$2,746,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.