70TH AVE E over I-5

0.9 N JCT SR 99 · County 053, Washington · Built 2021 · 4 Lanes · 17,977 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019333A0000000
Year Built
2021
Length
68.9 m (226 ft)
Max Span
67.1 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
17,977
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,952,000
Total Project Cost
$5,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.