SR 99 over HYLEBOS CREEK

1.1 N JCT I-5 · County 053, Washington · Built 1927 · 4 Lanes · 23,907 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0001105A0000000
Year Built
1927
Reconstructed
1953
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
17.2 m (56.4 ft)
Lanes
4
Daily Traffic
23,907
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$502,000
Total Project Cost
$1,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.