PUMPHOUSE RD. over CANAL - HIGHLINE PUMP

00.26 E TECUMSEH RD · County 077, Washington · Built 1990 · 2 Lanes · 65 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084108000000000
Year Built
1990
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
65
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$1,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.