TECUMSEH RD. over CANAL - HIGHLINE PUMP

00.16 N PUMPHOUSE · County 077, Washington · Built 1958 · 2 Lanes · 182 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
083399000000000
Year Built
1958
Reconstructed
2011
Length
9.8 m (32.2 ft)
Max Span
8.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
182
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$182,000
Total Project Cost
$365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.