HARRAH ROAD over TOPPENISH CREEK

0.79S MARION DRAIN · County 077, Washington · Built 1961 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
083001000000000
Year Built
1961
Reconstructed
2003
Length
11 m (36.1 ft)
Max Span
5.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
30
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$830,000
Total Project Cost
$1,661,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.