SR 241 over SULPHER CREEK WASTEWAY
5.2 N JCT SR 22 · County 077, Washington · Built 1961 · 2 Lanes · 5,550 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.286769, -119.999317
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 65 years old.
Nearby Bridges
DUFFY ROAD over SULPHER CREEK WASTEWAY
Built 1970
WANETA ROAD over BLACK CREEK
Built 1958
SR 241 over SULPHER CREEK WASTEWAY
Built 1980
MABTON-SUNNYSIDE over I-82
Built 1982
I-82 over SULPHUR CRK WASTEWAY
Built 1982
I-82 over UP RR
Built 1982
I-82 over UP RR
Built 1982
I-82 over MIDVALE ROAD
Built 1982
ALLEN ROAD over SULPHER CREEK WASTEWAY
Built 1983
I-82 over MIDVALE ROAD
Built 1982
Bridge Details
- Structure #
- 081464000000000
- Year Built
- 1961
- Length
- 21.3 m (69.9 ft)
- Max Span
- 7.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,550
- Material
- Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $598,000
- Total Project Cost
- $1,197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.