SR 241 over SULPHER CREEK WASTEWAY

6.6 N JCT SR 22 · County 077, Washington · Built 1980 · 2 Lanes · 1,911 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080456000000000
Year Built
1980
Length
21.3 m (69.9 ft)
Max Span
21 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,911
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$532,000
Total Project Cost
$1,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.