SR 241 over SULPHER CREEK WASTEWAY
6.6 N JCT SR 22 · County 077, Washington · Built 1980 · 2 Lanes · 1,911 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.302033, -119.993056
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 46 years old.
Nearby Bridges
I-82 over SULPHUR CRK WASTEWAY
Built 1982
MABTON-SUNNYSIDE over I-82
Built 1982
ALLEN ROAD over SULPHER CREEK WASTEWAY
Built 1983
SR 241 over I-82
Built 1981
I-82 over UP RR
Built 1982
I-82 over UP RR
Built 1982
YAKIMA VALLEY HWY over SULPHUR CREEK WASTEWAY
Built 1970
SR 241 over SULPHER CREEK WASTEWAY
Built 1961
WANETA ROAD over BLACK CREEK
Built 1958
FACTORY ROAD over SULPHER CREEK WASTEWAY
Built 1973
Bridge Details
- Structure #
- 080456000000000
- Year Built
- 1980
- Length
- 21.3 m (69.9 ft)
- Max Span
- 21 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,911
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $532,000
- Total Project Cost
- $1,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.