ALLEN ROAD over SULPHER CREEK WASTEWAY
00.19 E OF PENN RD. · County 077, Washington · Built 1983 · 2 Lanes · 1,720 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.309469, -119.987775
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 43 years old.
Nearby Bridges
I-82 over SULPHUR CRK WASTEWAY
Built 1982
SR 241 over I-82
Built 1981
YAKIMA VALLEY HWY over SULPHUR CREEK WASTEWAY
Built 1970
FACTORY ROAD over SULPHER CREEK WASTEWAY
Built 1973
SR 241 over SULPHER CREEK WASTEWAY
Built 1980
MABTON-SUNNYSIDE over I-82
Built 1982
EDISON RD. E. over SULPHER CREEK WASTEWAY
Built 1978
I-82 over UP RR
Built 1982
I-82 over UP RR
Built 1982
WANETA ROAD over BLACK CREEK
Built 1958
Bridge Details
- Structure #
- 084256000000000
- Year Built
- 1983
- Length
- 25 m (82 ft)
- Max Span
- 24.4 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,720
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,660,000
- Total Project Cost
- $3,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.