SR 241 over I-82
0.1 N JCT I-82 · County 077, Washington · Built 1981 · 3 Lanes · 14,611 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.306481, -119.9784
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
ALLEN ROAD over SULPHER CREEK WASTEWAY
Built 1983
I-82 over SULPHUR CRK WASTEWAY
Built 1982
YAKIMA VALLEY HWY over SULPHUR CREEK WASTEWAY
Built 1970
FACTORY ROAD over SULPHER CREEK WASTEWAY
Built 1973
SR 241 over SULPHER CREEK WASTEWAY
Built 1980
MABTON-SUNNYSIDE over I-82
Built 1982
WANETA ROAD over BLACK CREEK
Built 1958
ALLEN RD. E. over BLACK CREEK
Built 1958
EDISON RD. E. over SULPHER CREEK WASTEWAY
Built 1978
ALEXANDER RD. E. over BLACK CREEK
Built 1958
Bridge Details
- Structure #
- 0011901A0000000
- Year Built
- 1981
- Length
- 71 m (232.9 ft)
- Max Span
- 35.7 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 14,611
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,154,000
- Total Project Cost
- $6,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.