I-82 over MIDVALE ROAD
8.6 E JCT SR 223 · County 077, Washington · Built 1982 · 3 Lanes · 9,866 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.30625, -120.020178
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 44 years old.
Nearby Bridges
I-82 over MIDVALE ROAD
Built 1982
I-82 over UP RR
Built 1982
I-82 over UP RR
Built 1982
S. FIRST ST over SNIPES MTN LATERAL CANAL
Built 1997
MABTON-SUNNYSIDE over I-82
Built 1982
I-82 over SNIPES MTN LATERAL CANAL
Built 1980
I-82 over SNIPES MTN LATERAL CANAL
Built 1980
SUNNYSIDE AVENUE over Canal
Built 2019
SR 241 over SULPHER CREEK WASTEWAY
Built 1980
I-82 over SULPHUR CRK WASTEWAY
Built 1982
Bridge Details
- Structure #
- 0011772A0000000
- Year Built
- 1982
- Length
- 36.9 m (121.1 ft)
- Max Span
- 35.4 m
- Width
- 19.3 m (63.3 ft)
- Lanes
- 3
- Daily Traffic
- 9,866
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,150,000
- Total Project Cost
- $2,299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.