SUNNYSIDE AVENUE over Canal

00.01 N. CRESCENT · County 077, Washington · Built 2019 · 2 Lanes · 2,050 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089137000000000
Year Built
2019
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
2,050
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$722,000
Total Project Cost
$1,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.