SUNNYSIDE AVENUE over Canal
00.01 N. CRESCENT · County 077, Washington · Built 2019 · 2 Lanes · 2,050 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.322689, -120.019436
This bridge is in worse condition than 5.6% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 7 years old.
Nearby Bridges
S. FIRST ST over SNIPES MTN LATERAL CANAL
Built 1997
SWAN ROAD over SNIPES CANAL
Built 1957
I-82 over MIDVALE ROAD
Built 1982
I-82 over UP RR
Built 1982
I-82 over MIDVALE ROAD
Built 1982
I-82 over UP RR
Built 1982
MABTON-SUNNYSIDE over I-82
Built 1982
I-82 over SNIPES MTN LATERAL CANAL
Built 1980
I-82 over SNIPES MTN LATERAL CANAL
Built 1980
LESTER ROAD over SNIPES CANAL
Built 1958
Bridge Details
- Structure #
- 089137000000000
- Year Built
- 2019
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 2,050
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $722,000
- Total Project Cost
- $1,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.