96 ST E over PUYALLUP RIVER

0.66 E JCT SR 162 · County 053, Washington · Built 1985 · 2 Lanes · 4,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080405000000000
Year Built
1985
Length
116.1 m (380.9 ft)
Max Span
39.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,525
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,943,000
Total Project Cost
$11,886,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.