SR 162-VALLEY AVE over SR 410
JCT SR 410 · County 053, Washington · Built 1967 · 3 Lanes · 20,421 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.192861, -122.229417
This bridge is in worse condition than 57.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
SR 162 over PUYALLUP RIVER
Built 1973
TRAFFIC AVE over SR 410 RAMPS
Built 1967
TRAFFIC AVE over SR 410 RAMPS
Built 2021
E MAIN STREET over PUYALLUP RIVER
Built 1999
SR 410 over 166TH AVE
Built 1983
SR 410 over 166TH AVE
Built 1968
CANNERY WAY over WHITE RIVER
Built 2019
SR 167 over W VALLEY HWY
Built 1987
SR 167 over CITY STREETS & RR
Built 1973
SR 167 over WEST VALLEY HWY
Built 1972
Bridge Details
- Structure #
- 0008102C0000000
- Year Built
- 1967
- Reconstructed
- 1992
- Length
- 72.5 m (237.9 ft)
- Max Span
- 19.8 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 3
- Daily Traffic
- 20,421
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,487,000
- Total Project Cost
- $4,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.