CANNERY WAY over WHITE RIVER

0.3 E JCT SR 167 · County 053, Washington · Built 2019 · 2 Lanes · 9,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.203889, -122.245833

This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 7 years old.

Nearby Bridges

Bridge Details

Structure #
089134000000000
Year Built
2019
Length
92.7 m (304.1 ft)
Max Span
61.3 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
9,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,773,000
Total Project Cost
$9,546,000