E MAIN STREET over PUYALLUP RIVER

0.01 S JCT SR 410 · County 053, Washington · Built 1999 · 4 Lanes · 22,448 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
086494000000000
Year Built
1999
Length
120.1 m (394 ft)
Max Span
36.7 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
22,448
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$6,550,000
Total Project Cost
$13,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.