SR 410 over 166TH AVE
1.1 E JCT SR 162 · County 053, Washington · Built 1983 · 2 Lanes · 21,331 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.198006, -122.208206
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 43 years old.
Nearby Bridges
SR 410 over 166TH AVE
Built 1968
SR 162-VALLEY AVE over SR 410
Built 1967
SR 162 over PUYALLUP RIVER
Built 1973
CANNERY WAY over WHITE RIVER
Built 2019
45 ST E over LAKE TAPPS
Built 1970
TACOMA AV E over WHITE RIVER
Built 1999
TRAFFIC AVE over SR 410 RAMPS
Built 1967
TRAFFIC AVE over SR 410 RAMPS
Built 2021
FRYAR AV over WHITE RIVER
Built 1949
SR 167 over W VALLEY HWY
Built 1987
Bridge Details
- Structure #
- 0012428A0000000
- Year Built
- 1983
- Length
- 29 m (95.1 ft)
- Max Span
- 27.5 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 21,331
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.