REDMOND WAY over 154TH AVE NE
2.5 MI E JCT I-405 · County 033, Washington · Built 1992 · 6 Lanes · 27,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.673556, -122.1335
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 34 years old.
Nearby Bridges
Redmond Way over SAMMAMISH R
Built 1972
LEARY WAY over SAMMAMISH RIVER
Built 1992
NE 85TH STREET over SAMMAMISH RIVER
Built 1985
SR 520 W-N RAMP over SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over WLS PKWY & SAMMAMISH R
Built 1976
SR 520 N-E RAMP over W L SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over PKWY & SAMMAMISH RIVER
Built 1995
148TH AVE NE over HILLSIDE SLOPE
Built 1991
NE 90TH ST over SAMMAMISH RIVER
Built 2001
NE MARYMOOR WAY over SAMMAMISH SLOUGH
Built 1963
Bridge Details
- Structure #
- 002003650000000
- Year Built
- 1992
- Length
- 26.2 m (86 ft)
- Max Span
- 25.3 m
- Width
- 24.9 m (81.7 ft)
- Lanes
- 6
- Daily Traffic
- 27,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,922,000
- Total Project Cost
- $7,843,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.