NE 90TH ST over SAMMAMISH RIVER
0.5 MI W OF SR-202 · County 033, Washington · Built 2001 · 4 Lanes · 17,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.682194, -122.133
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 25 years old.
Nearby Bridges
NE 85TH STREET over SAMMAMISH RIVER
Built 1985
Redmond Way over SAMMAMISH R
Built 1972
REDMOND WAY over 154TH AVE NE
Built 1992
148TH AVE NE over HILLSIDE SLOPE
Built 1991
LEARY WAY over SAMMAMISH RIVER
Built 1992
SR 520 W-N RAMP over SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over WLS PKWY & SAMMAMISH R
Built 1976
SR 520 over PKWY & SAMMAMISH RIVER
Built 1995
SR 520 N-E RAMP over W L SAMMAMISH PKWY/RIVER
Built 2010
UNION HILL ROAD over BEAR CREEK
Built 1994
Bridge Details
- Structure #
- 087126000000000
- Year Built
- 2001
- Length
- 67.1 m (220.1 ft)
- Max Span
- 30.5 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 17,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,774,000
- Total Project Cost
- $13,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.