148TH AVE NE over HILLSIDE SLOPE
0.1 MI N OF JCT SR-908 · County 033, Washington · Built 1991 · 4 Lanes · 18,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.677314, -122.144386
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 35 years old.
Nearby Bridges
NE 85TH STREET over SAMMAMISH RIVER
Built 1985
REDMOND WAY over 154TH AVE NE
Built 1992
Redmond Way over SAMMAMISH R
Built 1972
NE 90TH ST over SAMMAMISH RIVER
Built 2001
LEARY WAY over SAMMAMISH RIVER
Built 1992
OLD REDMOND ROAD over 138th AVE NE
Built 1970
SR 520 W-N RAMP over SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over WLS PKWY & SAMMAMISH R
Built 1976
SR 520 N-E RAMP over W L SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over PKWY & SAMMAMISH RIVER
Built 1995
Bridge Details
- Structure #
- 085762000000000
- Year Built
- 1991
- Length
- 153.9 m (504.9 ft)
- Max Span
- 27.4 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 4
- Daily Traffic
- 18,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,356,000
- Total Project Cost
- $12,713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.