NE MARYMOOR WAY over SAMMAMISH SLOUGH
0.5 MI S OF SR-520 · County 033, Washington · Built 1963 · 2 Lanes · 1,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.6623, -122.124436
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 63 years old.
Nearby Bridges
SR 520 N-E RAMP over W L SAMMAMISH PKWY/RIVER
Built 2010
SR 520 over PKWY & SAMMAMISH RIVER
Built 1995
SR 520 over WLS PKWY & SAMMAMISH R
Built 1976
SR 520 W-N RAMP over SAMMAMISH PKWY/RIVER
Built 2010
NE 60TH ST over SR 520
Built 1980
LEARY WAY over SAMMAMISH RIVER
Built 1992
NE 51ST STREET over SR 520
Built 1987
Redmond Way over SAMMAMISH R
Built 1972
RAMP over RAILROAD SHARED USE PATH
Built 2023
REDMOND WAY over 154TH AVE NE
Built 1992
Bridge Details
- Structure #
- 080543000000000
- Year Built
- 1963
- Length
- 35.7 m (117.1 ft)
- Max Span
- 16.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Local Park, Forest, or Reservation Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,292,000
- Total Project Cost
- $4,585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.