RAMP over RAILROAD SHARED USE PATH

JCT SR 520 · County 033, Washington · Built 2023 · 2 Lanes · 7,611 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
002005540000000
Year Built
2023
Length
30 m (98.4 ft)
Max Span
16.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
7,611
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$917,000
Total Project Cost
$1,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.