BERKELEY AVE over I-5
7.7 N THURSTON CO · County 053, Washington · Built 2020 · 5 Lanes · 14,599 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.119114, -122.558556
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 6 years old.
Nearby Bridges
SB OFF RAMP over TERRAIN
Built 2020
SB ON RAMP over TERRAIN
Built 2020
THORNE RD over I-5
Built 2020
MURRAY RD SW over I-5
Built 2020
MADIGAN AVENUE over MURRAY CREEK
Built 2013
NCO BEACH RD over AMERICAN LAKE
Built 1995
I-5 SBCD over 41ST DIVISION
Built 1954
I-5 over 41ST DIVISION DR
Built 1954
I-5 over 41ST DIVISION DRIVE
Built 1969
I-5 NBCD over 41ST DIVISION DR
Built 1969
Bridge Details
- Structure #
- 0019133A0000000
- Year Built
- 2020
- Length
- 159.1 m (522 ft)
- Max Span
- 48.2 m
- Width
- 26.2 m (86 ft)
- Lanes
- 5
- Daily Traffic
- 14,599
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,182,000
- Total Project Cost
- $16,365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.